2024-08-10 Meeting Minutes

2024-08-10 Meeting Minutes

 Date

Aug 10, 2024

 Participants

  • @Miguel

  • @Alfeldt, Maddy

  • @Ben Graham

  • @Carter Schlomann

  • @Peter Tselekis

  • @Vann Wellmon

  • @Gormley, Thomas

 Goals

  • Prepare for beginning of school year & fall onboarding season

  •  

 Discussion topics

Time

Item

Presenter

Notes

 

Time

Item

Presenter

Notes

 

5 min

General Announcements

Miguel

  • Welcome!

 

15 min

Onboarding Fall 2024

 

All

  • Activities Fair/WBW 9/4 4:30-6:00 @ Union Circle

    • What would teams like to show off? (Portable)

      • USLI

        • Windowbreaker

        • Payload 22-23 and 23-24

        • Advertising trifold + Photos

        • Barry 63

        • Pins, Stickers, 3D-Printed Badges

      • SmallSat

        • ECE components, Yagi antenna

      • Hobby

        • Fury II

        • Tbh just all of Peter’s rockets.

        • Altair

        • Some L1s - Need permission from builders. Looking for an unpainted and painted (preferably brighter colors) one to show off design.

        • Flight computers

        • CARTER’S HUGE ROCKET

        • **Bring Tablecloths

      • RPL

        • Engine hardware

  • Callout Meeting set for Sat 9/7, 5-7PM in Lake Room

    • Slideshow?

      • Sending out templates to PMs; 15 min max, brief

    • Intro video/Rocketry trailer?

    • What would teams like to show off? (Portable, remember, we need to walk to the BIC)

      • USLI

        • Payload 22-23 and 23-24

      • SmallSat

      • Hobby

        • Fury II

        • 1-2 L1s - Need permission from builders.

        • (Mostly) Disassembled kit

      • RPL

    • Pass hardware around

 

15 min

New RR Ordering Forms

Thomas

  • Brief rundown on new ordering system

 

10 min

SpaceVision Travel & Priority

Miguel

  • Travel logistics + OTFR

    • 5 people + Dr. K

    • OTFR over summer, fully covers current cost

  • Interest form + timeline

  • PMs go, knowledge of systems

    • Dr. K wants to drive

 

10 min

SmallSat & Louis AFRL Opportunity

Miguel/Thomas

  • AFRL

  • Rose exposure & IA

    • Reaching out; less expertise

    • Agree with sentiment of inexperience; would need to rebuild smallsat

 

10 min

New RHIT Transport Policies

Miguel/Peter

  • Not new, we’ve just been operating under an exception

  • All travel past 40mi will need to use RHIT or rented vehicles.

    • RHIT is faculty only

      • BIC Bus is licensed faculty only

    • Rented can be driven by anyone 21+

  • Pre-launch testing and prep early on

  • Cancellation fees $50 more than 24hr before

 

10 min

L1 kit and epoxy ordering

Peter

  • Beginning of year hobby cost: ~1k-$1.5k

  • Kit amount and methodology determined, sticking with our own kits due to spare parts.

  • No recovery hardware - 3 L1s taken home last year none had intention to fly at home.

  • Kevlar purchase.

  • Quick 1gal vs 2gal epoxy discussion and decision.

  • CTI H54 motor order from AMW?

 

5 min

L1 sign up process

Peter

  • Preliminary interest form at callout meeting after hobby introduction - gives me opportunity to plan out how many build sessions needed.

  • Build session form 9/8 at 4pm

  • First build session tentatively 9/10 7pm

  • First launch is 9/28 at CIA Dodds Park, same site as first launch last year, weather and travel permitting.

 

5 min

Certification program overhaul and expectations

Peter

  • New guides for L1 and L2/Research will be ready by activities fair.

  • L1 guide was rewritten from the ground up to have enough detail and CAD so that someone with no experience or instructor can build.

  • L2 guide clarifies language and now requires the following to submit a proposal:

    • Contact info

    • Rocket specs and performance estimates

    • Borrowed items

    • For projects that use a motor that requires L2 cert: Completed L1 build or L1/L2 on the same rocket. Insurance policy against “express interest and don’t finish.”

  • Expecting roughly:

    • 5-7 total L2 flights

    • 2 L2 flights funded in previous years (no funding impact) - Peter and Miguel

    • 1 L2 motor and recovery hardware only (Roughly $95 “spent” but motor bought in previous years)

    • 3-5 L2 proposals funded this year depending on remaining budget and how expensive proposals are.

 

TBD

 

 

 

 

5 min

Open Discussion

 

  • Later meeting on constitution editing + VP election logistics

  • 1:1 with PMs and leads on team basis (timeline, admin & tech scoping)

  • Stay posted for link to callout meeting slides & add your team’s info

 

 Action items

Bring tablecloths to activities fair
Sent callout presentation
Presentation; define relationship, get Stamper involved
@Peter Tselekis Schedule L1 build sessions - total of 250 slots. Use campusgroups events for build sessions. People so far willing to help: Carter, Mikey, Miguel (Some days depending on Masters Coursework), Ben.
Find out when is last floor dinner
Schedule smallsat meeting with Louis for what smallsat is going to do
Constitution: define ‘exec’ (Interest form for subteam leads)

 Decisions

  1. No H54 order
  2. Descoping beginning of year L1s to 20 = motors in posession
  3. Will preorder more motors from Chris
  4. Build sessions scheduled before callout meeting
  5. 2 gal of epoxy
  6. Build schedule tentative: MWF + Open Build Saturdays
  7. Need to ping people interested in helping on L1 instruction

 

 

 

Welcome back Wednesday

 

Ask PM’s what they want to bring

 

USLI:

Bring last years rocket and barry 63 standing + payloads on the table

Trifold of usli

Pins

Stickers

Badges

  • Aiden is working with tom

Table Cloths

Smallsat - Evan is not available to join us but can message

- bring ground station antenna

Table order
USLI

Hobby

RPL

SmallSat

 

Hobby

Peter + Gabrial L2s

1 painted L1 and 1 unpainted L1

Carter willing to display L1

Flight Computer

 

Call Out Meeting

 

Sat following welcome back Wednesday

5-7 in the lake room

Intro video / rocketry trailer

  • peter owns

If anyone wants to help - message peter


Cool intro video

 

Intro

PMs

Mingle


General props - 1 level “more” detail than welcome back Wednesday

Callout meeting - we are getting a dedicated display table

Bring “passable” hardware



New Ordering Forms

Updates from thomas

 

SpaceVision OTFR

 

Lock in president for SEDS Spacevision

BIC staff member will drop off and pick up at IND

Louis

In space assembly - very receptive to having smallsat work on something to launch

 

Rose transport policies

All travel past 40 miles - need to use rose vehicles