2023-03-24 Weekly Meeting Minutes

Meeting Takeaways

 Date

Jan 27, 2023

 Participants

  • Sam

  • Peter

  • Miguel

  • Morrison

  • Lance

  • Tim

  • Onur

  • Yeijia

 Goals

  •  

 Discussion topics

Topic

Presenter

Notes

Topic

Presenter

Notes

Introductions

Everyone

Kayden is back! And we welcomed Yeijia

Recap from Last Week

 

Done and easy :?

Updates

Miguel

  • Ahh Rocketry grind week

  • Timeline to prep for CSLI

  • More discussions with Louis to determine feasibility

    • Make a decision on payload (determining if we want to do a StarShade or ATSP-Based

  1. Fully functional prototype by the end of the quarter, with some testing – see page

Updates

Peter

  • Jack spec'd out for all the components $900

  • for minimum 3 boards - spec'd out 6 for hard to get components

  • Didn’t get them from CalPoly bc they had limited reserves, and we ended up finding them, so didn’t need them

  • If 3 additional PCBs are less then 70 more then we get 6 to start with instead of 3.

Updates

Lance

  • Power budget!! svg!

  • Power over time for solar panels from Simulink simulation

  • 2/3 in the sunlit side

Ground Station

Sam, Morrison, Tim

  • @morrison Talk to Andy, figure out path forward for filter,

    • Install GNU on pi if get from peter

    • Look at Oresat - have a very good idea of high level

  • @Timothy Ausec Look into power supplies

    • EasyComm protocol working with LEDs for correct outputs

  • @Sam High level block diagram of all components and data lines

  • @Sam finish grant

 

 

 